Portfolio
University of Texas at El Paso Engineering Complex Addition
- Location
- Hawthorne Street on the U.T.E.P. campus
- Size
- 42,000 s.f. +
- Budget
- All three phases $7,500,000.00
- Completion
- Final of Phase 3 was April of 2008
- Owner
- University of Texas at El Paso
- Client Contact
- Mr. Greg McNicol, AIA
University of Texas at El Paso
915-747-7182
The U.T.E.P. Engineering Complex Addition is a three story Administration and Office wing to the east of the existing Engineering Complex. The facility has a half basement which houses the mechanical systems and a Materials Testing Lab.
The 42,000 S.F. addition was constructed in 3 phases, with the 1st phase being the shell of the buliding and the finish out ot the 3rd floor faculty offices and Engineering Department offices for Electrical/Computer Engineering. This was completed in 2004.
Phase 2 was the second floor build-out of faculty offices and Department offices for Civil Engineering and offices for Metallurgical Engineering and was completed in 2006.
The final phase was the Interior completion of the 1st floor. It was comprised of the Dean of Engineering Suite, offices for the Departments of Mechanical/Industrial Engineering and faculty offices. Additional spaces included two large meeting spaces and a large presentation/conference room. Completion was 2008.